Jump to content

slow rollin

Professional
  • Posts

    831
  • Joined

  • Last visited

Everything posted by slow rollin

  1. Bump
  2. Thank you
  3. Thank you Glenn. It was nice meeting you.
  4. Pd buoy. What do you need done?
  5. Thank you send pics of the walleye and I will drive back for a good fish fry. Thanks for the business
  6. Thanks for the kind words.
  7. We also offer full winterization services including shrink wrap.
  8. Well you have 2 measurements when installing a new shift cable. Barrel to eye is 6 in and the other is post to post should be 3 in. Sonning the barrel is not how you should adjust shift cable. There is a small crecent shaped groove with a 5/16 but that you adjust your shift with. Loosen nut just enough so that you can change the position slightly inside the groove and snug it up and check the shift( in the water under load) untill you find the sweet spot for forward and reverse.
  9. Yes we install electronics also.
  10. What do you need?
  11. Thank you longbow. Pleasure meeting you. See you next week.
  12. Thank you John. It was nice meeting you.
  13. I did. I called you and left you a message. Call again I was on the tractor when you called.
  14. Yes. What do you need installed? Thanks Mike
  15. Yes I can get the bellows/ gimble bearing done this week.
  16. Marine Technician taking on some side work. 10+ years professional experience . Send phone # and a description of what you would like to have done and I will contact you asap. Thank you
  17. Ok will do.
  18. Marine tech taking on some additional work in the finger lakes and lake o region. Send pm of what you're looking to have done. Can travel if necessary. Thanks
  19. I forgot to re post. Still available!
  20. Yes I was going to bump the post and forgot about it.
×
×
  • Create New...