When using my snap weights on long lines I add them to the connection between copper or cores and leader. If you let out all the copper and then add a weight you still need to let out a ton of line to get the weight down. At the end of your weighted line your already going to be letting out plenty of line to get it down. But I have done both ways just prefer to add it before the weighted line.